Technical Committees
APSN is organised in various workpackages as shown in its structure
poster. Two workpackages within APSN are responsible for integration
activities:
- The workpackage
4 aiming at research integration and led by TU
Graz is divided in 5 technical working groups based
on research areas.
- The workpackage
5 aiming at user needs integration and led by CIDAUT
is divided in 5 user groups based on the types of road users.
There is a relation between the 5 user groups and the
5 working groups as shown in te matrix below:

The user groups can be seen as cross sections of the working
groups, i.e. they provide the working groups with future (user)
demands for technological developments and at the same time they
are taking results from the working groups to their specific application
areas.
Top of page.
|